Innovative technologies for material-saving construction by Stahlton Bauteile showcased at NEST STEP 2 opening

Stahlton AG
Wässeristrasse 29
8340 Hinwil
Switzerland

The ribbed-filigree slab of the EMPA NEST STEP2 building, combining digital design and fabrication, 3D printing, optimized acoustics and low carbon materials, was a highlight of the STEP2 opening ceremony. Stahlton Bauteile's role in the project's development and production of pre-fabricated elements based on 3D-printed formwork were showcased.

See the end result and learn about the project here:  https://www.youtube.com/watch?v=ZbS7gbQFRCA